Welcome to Zhejiang Chenfeng Technology Co., Ltd.

Switching in Chinese and English
简体中文

Zhejiang Chenfeng Technology Co., Ltd.

Lighting layout to be reasonable how to install is particularly important

2016-08-22 10:42:47 Zhejiang Chenfeng Technology Co., Ltd. Read

Lamp installation essentials is:

(1) indoor installation of wall lamp, lamp, table lamp, floor lamp, mirror lamp lamp, the height is less than 2.4m and below, the lamps and lanterns of metal shell shall be grounded reliably. To ensure the use safety (in the wiring box lights should be combined with a ground wire).

Cord chandelier cord ends are to be used as protective buckle, at both ends of the wire should be lining tin and cord (cap line) section should not be less than 0.4mm2.

(2) toilet and kitchen with dwarf lamp, should adopt the ceramic screw dwarf lamp. Line connection, screw socket (switch line) should be in the center of contact terminals. The zero line is connected to the screw terminal.

(3) lamp with switch lamp holder, for safety, at the beginning of the handle should not have exposed metal parts.

(4) when the flat roof installation of various types of lamps and lanterns, should be installed in accordance with the requirements of the installation instructions. Light weight is greater than 3kg, by pre buried hook or from the roof of the expansion bolt is directly fixed hanger installation (not hanging flat keel hanging bracket, lamp). Drawn from the lamp holder box box wire application protection hose lamp to prevent wire, exposed in the flat inside.